Set Up Test Lanes

Choose a Mac and Set a Term

Choose daily, weekly, monthly, or quarterly billing. Service stops at the end of your term unless renewed.

Choose a machine based on your testing workload, then pick a term that fits your release schedule. VMO Lane M4 starts at $20.9/day. Choose VMO Lane Pro for more memory and storage.

These are cloud-hosted physical Mac nodes that run the macOS GUI and command line—not mobile devices included with your rental.

Choose Your Machine

Both plans provide a dedicated machine. Start by running your baseline tests on one node, then add nodes as you split up the test suite. This is more reliable than guessing how many simulators can run at once.

Prices shown are per machine per day. See the table below for full-term rates.

VMO Lane M4

For everyday regression tests

$20.9/day

M4
16GB
256GB SSD

Ideal for establishing a testing baseline, running regression tests in parallel, and moving test workloads off shared development machines. Check your project, dependencies, and simulator runtime storage needs before deciding whether to add storage.

Plan concurrency:Start with one simulator and gradually increase the count while monitoring memory pressure and test duration. This is a starting point for validation, not a guaranteed concurrency limit.

Choose This Plan Dedicated Physical Mac mini

VMO Lane Pro

For demanding test suites

$60.2/day

M4 Pro
64GB
2TB SSD

Ideal for large UI test suites, multiple simulator runtimes, and projects with higher memory demands. If your baseline run shows memory pressure, upgrade to a single more powerful machine before considering additional test shards.

Plan concurrency:Validate step by step using the same baseline tests. Test isolation, simulator versions, and project size all affect the number of tests you can run at once.

Choose This Plan Dedicated Physical Mac mini
Compare rental rates per machine. All amounts are in USD and exclude add-ons.
PlanDailyWeeklyMonthlyQuarterly
VMO Lane M4$20.9/day$56.5/week$104.7/month$284.8/quarter
VMO Lane Pro$60.2/day$162.5/week$300.9/month$818.4/quarter

Check the Specs

Record the configuration in your test environment notes. Matching the chip and memory is just the start: keep Xcode, simulator runtimes, dependency lockfiles, and Test Plans consistent too.

VMO Lane M4

Chip
Apple M4
Memory
16GB
Storage
256GB SSD
Network
Remote network access; connection details are provided in the console
Machine type
Dedicated physical Mac mini, not a virtual machine
Available locations
5 locations

VMO Lane Pro

Chip
Apple M4 Pro
Memory
64GB
Storage
2TB SSD
Network
Remote network access; connection details are provided in the console
Machine type
Dedicated physical Mac mini, not a virtual machine
Available locations
5 locations

Network throughput, simulator startup time, and test suite duration depend on your workload. We don’t present unverified benchmarks or concurrency figures as guaranteed specs.

Add What You Need

Check storage used by runtimes, build caches, and xcresult files before adding capacity. Add-ons are billed separately for your selected term; confirm the final configuration and price when ordering.

Add 1TB SSD

Store multiple simulator runtimes, project dependencies, and test artifacts. If storage is tight, clear unused caches first, then add capacity as needed.

Daily
$2.1/day
Weekly
$5.7/week
Monthly
$10.5/month
Quarterly
$28.6/quarter

Add 2TB SSD

Keep a larger collection of runtimes and archive test results. If you already archive reports elsewhere, first check how much data you really need to retain locally.

Daily
$4.2/day
Weekly
$11.4/week
Monthly
$21/month
Quarterly
$57.2/quarter

Thunderbolt 5 Daisy-Chaining

A connection option for coordinating test shards across multiple machines, priced per machine. It doesn’t replace scripts for distributing tests and merging reports, so confirm your connection requirements before ordering.

Daily / per machine
$1.5/day
Weekly / per machine
$4/week
Monthly / per machine
$7.4/month
Quarterly / per machine
$20.1/quarter

Estimate Your Node Count

Estimate the resources for a test run using machine rental rates. Each machine is priced for the selected term. Storage upgrades and Thunderbolt 5 daisy-chaining are extra; more nodes don’t translate directly into proportional speedups.

Choose a plan
Enter a positive whole number. This estimate is for budgeting only; it doesn’t create nodes or confirm availability.
Choose a term

4 × VMO Lane M4 × 1 week

Machine total $226

Based on $56.5/week per machine; add-ons not included.

Your selected plan will be prefilled at checkout. Confirm the machine count and term during the order process. This estimate won’t create a bulk order automatically.

When splitting up tests, separate cases that rely on shared state and can’t run in parallel. Then adjust the groups based on measured shard times. Environment setup, dependency downloads, and report merging all add overhead, so adding nodes won’t reduce total run time in direct proportion.

Choose a Location

Both plans are available in all 5 locations below. Locations marked as having ample capacity are listed in the catalog; check the console for real-time availability.

Compare plans and locations. Select a location when you place your order.
PlanSingaporeJapan (Tokyo)South Korea (Seoul)Hong KongUS West
VMO Lane M4Ample capacityAmple capacityAmple capacityAmple capacityAmple capacity
VMO Lane ProAmple capacityAmple capacityAmple capacityAmple capacityAmple capacity

Choose a location that works well for your team’s interactive access, code downloads, and test backend. Running a simulator in a location doesn’t provide a mobile device, carrier network, or app store environment in that region. For region-specific testing, set up and verify the test conditions separately.

Know Who Gets Each Machine

Each machine is dedicated to one customer. The two test lanes below illustrate machine allocation; they don’t represent actual runtime activity.

LANE A One dedicated physical Mac mini

Assigned to one customer, who manages test shards, simulators, and dependencies.

LANE B Another dedicated physical Mac mini

Runs a separate set of test shards, with no test processes from other customers sharing the machine.

Machine-level isolation reduces resource contention from shared hosts, but it doesn’t replace isolation in your tests. Use separate test accounts, data cleanup strategies, and traceable report names for parallel tests to prevent shards from overwriting each other’s state.

Payment Details

Pay in USD using USDT-TRC20 or Visa, Mastercard, or Amex via Stripe. Available payment gateways are confirmed by the backend.

Review Before Paying

Before paying, check your plan, location, term, and add-ons. For USDT-TRC20, follow the instructions on the payment page; card payments are processed by Stripe. Verify the payment against your order and billing records in the console.

Service Ends at Expiry

If you don’t renew, the machine is stopped and reclaimed at the end of your term, then wiped and reinstalled. Export code, logs, xcresult files, and anything else you need to keep during your rental. Don’t use the node’s disk as your only archive.

Add the term end date and report archive owner to your team’s release checklist. If testing isn’t finished, confirm renewal in the console before submitting long-running jobs, so they don’t run past expiry.

Ask Before You Order

For changes to an existing order, sign in to the console and submit a support ticket with your order details and preferred timing.

Can I add a machine while tests are running?

Yes. Place an additional order for another node, subject to real-time availability in the console. The new node has its own delivery and rental records; it won’t inherit the original node’s environment. Reuse your dependency list and test configuration, then assign pending shards to the new node to avoid rerunning or missing tests.

Can I switch from weekly to monthly billing?

You can request monthly service before your current term ends. The renewal method and start date are confirmed in the console and support ticket. Don’t assume a new monthly order will keep the original node, or that unused time will be credited automatically. Back up important files before confirming the arrangements.

Can I change locations after my order starts?

To run tests in another location, place a new order for the target location and confirm how to handle the original order through a support ticket. Processes, files, and connection details won’t transfer automatically. Archive your results, rebuild the environment on the new node, and run baseline tests before moving future workloads.

What happens to test data when my term ends?

If you don’t renew, the node is stopped and reclaimed at the end of your term, then wiped and reinstalled. Export test reports, screenshots, logs, and any required configuration in advance, and check that your archived files can be opened. Don’t assume you’ll be able to log in after expiry to retrieve files, or rely on recovery after the wipe as an archiving strategy.

Why don’t you list a fixed simulator concurrency limit?

The same number of simulators can create different workloads depending on the iOS runtime, app size, and test scripts. Fix your versions and test set, record the run time, memory pressure, and failure causes with one simulator, then increase concurrency step by step. If failures stem from shared test data, adding more resources won’t solve the problem by itself.

Set Up Your Test Lanes

Get one machine running first, then add nodes as you split up tests. Choose a plan, machine count, and term to continue to checkout, and confirm the full amount before paying.