Add three Macs to clear the regression queue
Keep your existing baseline machine and add 3 VMO Lane M4 nodes by the day during release week. Split work that would otherwise run on one machine into four lanes: core transactions, account flows, product pages, and failure reruns. That way, the entire regression cycle doesn't have to wait for the first task to finish.
Record a single-machine baseline before adjusting the split. Four machines running together don't automatically deliver 4× the speed; account for test dependencies, startup preparation, and report archiving in the total runtime.
Split by runtime
Use results from the previous run to allocate Test Plans. Distribute long-running tests across nodes so equal test counts don't end up with very different runtimes.
Isolate test data
Give each test lane its own data and results directory. Use the same code commit and dependency versions to avoid overwrites and environment drift.
Wait for all results
Each node uploads its own xcresult. Generate release sign-off only after every lane finishes and failures have been categorized.
Choose VMO Lane M4
M4 / 16GB / 256GB SSD. A good starting point for everyday regression splits; add simulators gradually based on your project's actual memory use.